The Microsoft Theater project in downtown Los Angeles was part of a three building muti-use project called LA Live. ESC’s Rout and Return DRY panel system was utilized successfully on all three project. The projects were delivered on a simultaneous delivery schedule. ESC delivered more than 8,000 panels over a 15 month period on the three projects, without disruption to the construction schedule. ESC was proud to be part of this quality high profile project.
ELS Architecture and Urban Design
Berkeley, CA
Clark Construction
Costa Mesa, CA
AGA Silversmith 4mm Plus Core Alucobond
Garston 4mm Plus Core Alucobond
3A Composites Benton, Kentucky