The LA LIVE project in downtown Los Angeles was part of a three building multi use project that included the Nokia Theater. Elward Systems Rout and Return Dry panel system was utilized successfully on all three projects. The projects were delivered on a simultaneous delivery schedule. ESC delivered more than 8,000 panels over a 15 month period on the three projects, without disruption to the construction schedule. ESC was proud to be a part of this quality high profile project.
ELS Architecture and Urban Design
Berkeley, CA
Clark Construction
Costa Mesa, CA
CMF Inc.
Orange, CA
Silver Metallic 4mm Plus Core Alucobond
3A Composites Benton, Kentucky