The new 3-story, 86,000 GSF Los Alamitos High School building will replace a majority of the 30 existing portable classrooms with permanent facilities, accommodate the entire Science department, and will be located at the front of the campus to enhance school safety and improve vehicular access. The design acknowledged the district’s desire to produce a long-term solution for a high-performance environment, and replace 50 years old aging campus facilities. Elward provided a Rout & Return DRY System with Alucobond panels in Image Blue and Bone White with color-matched extrusions.
Westgroup Design
Irvine, California
Maranatha Sheet Metal
Santa Ana, California
Alucobond Image Blue, Bone White Panels with Elward Rout & Return DRY System with color-matched extrusions.