![]() |
|
| Los
Angeles Fire Department Central Command Center - Los
Angeles, CA. |
![]() |
Material:
23,000 sq.ft. of Champagne Metallic Duranar XL Alucobond Panel System: Gasket dry system Architect: Fluor Daniel, Irvine, CA. General Contractor: Shirley Brothers, Inc., Pasadena, CA. |
| Comments: This particular design required ESC's panel system to cover the cross-bracing beam support while tying into the glass system beyond. | |
|
© 2008 Elward Systems Corporation.
© 1996 - 2008 Elward Systems Corporation. All rights reserved. |